Project Handover Checklist: Don't Lose What You Know

A good project handover covers five things: where everything lives, current status and next steps, open risks, promises made to the client, and how that client likes to work. Write it down, walk through it live, and have the new owner confirm they can find everything before the old owner steps away.

Most of what gets lost in a handover isn't in any file. It's the context: why a decision was made, what the client is sensitive about, which deadline is soft and which one isn't. A checklist forces that out of someone's head and into writing.

When you need a handover

I include a 60 minute handover at the end of every 30-day pilot, with a written plan for what to fix next, because a system nobody can run without me isn't finished.

The checklist

Where everything lives

Current status

Risks and issues

Promises and agreements

The client

Recurring work

How to run the handover

  1. The old owner fills in the checklist. In writing, linked from the project.
  2. Walk through it live. 30 to 60 minutes. The new owner asks questions; answers get added to the doc.
  3. Introduce the new owner to the client. A short email or call so the client knows who to go to.
  4. Overlap if you can. Even two or three days of overlap catches most of what the checklist missed.
  5. The new owner confirms. They can find every file, log in to every tool and explain the next three deadlines.

Make handovers easier by default

The best handover is one that barely needs doing, because everything is already where it should be. That happens when:

If a handover at your agency would be painful, that's a sign of key person risk.