To write an SOP your team will actually use, keep it short, write one action per step, put it inside the tool where the work happens, and test it by having someone else follow it without help. Most SOPs fail because they're too long, too vague, or stored somewhere nobody looks.
I've written SOPs for startups, agencies and marketing teams since my first job, when I kept ending up as the person who wrote down how things worked. Here's what I've learned about making them stick.
Why most SOPs don't get used
- They're written once and never updated. The process changed six months ago. The SOP didn't.
- They describe the ideal, not reality. People can tell, and they stop trusting it.
- They're too long. A 12-page document for a 15-minute task doesn't get read.
- They live in a folder. If someone has to go looking for the SOP, they won't.
- Nobody owns them. When everyone is responsible, nobody updates it.
A simple SOP template
Every SOP I write follows the same structure:
Name: what the process is, in plain words. "Launch a client email campaign", not "Email Deployment Protocol v2."
Purpose: one sentence on why it exists.
Owner: the one person responsible for keeping it up to date.
When to use it: what triggers this process.
Before you start: what needs to be true or ready.
Steps: numbered, one action per step, starting with a verb.
Done when: how you know it's complete.
Last updated: a date.
Write steps people can follow
Compare these two versions of the same step:
Ensure all relevant stakeholders have provided the necessary sign-off on the creative assets prior to scheduling.
- Check the "Approved by" field on the task has the client's name. If it's empty, don't schedule. Message the account lead.
The second one tells you exactly what to look at and what to do if it's wrong. That's the standard to aim for.
Tips for writing steps:
- Start every step with a verb: open, check, send, move, tag
- One action per step
- Name the exact field, folder or button
- Say what to do when something isn't right
- Add a screenshot where the interface is confusing
Record first, write second
The fastest way to write an SOP is to watch someone do the task. Ask the person who does it best to record a Loom while they talk through it. Then turn the recording into numbered steps. You'll catch details they'd never think to write down because they do them on autopilot.
Test it
Give the SOP to someone who has never done the task. Ask them to follow it with no help. Wherever they get stuck or ask a question, the SOP needs more detail. Wherever they skip a step because it's obvious, you can cut it.
Put it where the work happens
This is the part that makes the biggest difference. Link the SOP inside the task template in your project management tool, so it's right there when someone starts the work. In ClickUp, that might be a Doc linked in the task description or a checklist built into the template. In Asana or Notion, it works the same way.
If your tool is too messy for this, clean it up first.
Keep it alive
- Give each SOP an owner
- Review SOPs every quarter, or whenever the process changes
- When something goes wrong, ask: did the SOP cover this? If not, update it
- Add a "last updated" date so people know it's current
Where to start
If you don't have any SOPs yet, start with the first five every creative agency needs. They cover the points where most delivery problems start.
SOPs are also the best protection against key person risk: when knowledge is written down, it doesn't walk out the door.
Want help?
My free Agency Operations Toolkit includes an AI advisor that interviews you about a process and drafts the SOP for you in ChatGPT or Claude. If you'd rather have someone write them and set them up in your tool, that's part of my operations service.
Quick answers
How long should an SOP be?
As short as possible while still being followable by someone new. Most task-level SOPs fit on one page. If it's longer than three pages, split it into smaller processes.
Who should write SOPs?
The person who does the task best should record or explain it. Someone else, often an operations or project manager, turns that into clear steps and tests them.
Where should SOPs be stored?
Inside the project management tool, linked from the task template where the work happens. A shared folder is fine as a backup, but people won't go looking for it mid-task.